With an in-depth understanding of flowline and umbilical installation issues, Ashtead Technology has the expertise to provide a complete solution to many installation, verification and operational needs.
The installation of flowlines and umbilicals is a high-risk operation. Driving productivity through increased installation speed and reduced vessel time is required to minimise any cost over-runs.
Knowledge of multiple aspects of the installation process is required to identify and manage the location, catenary shape, touchdown point, tension, burial depth and visual confirmation of status. In addition, the monitoring of trenching and burial equipment is a vital part of flowline and umbilical installation.