Suction pile manifold installation monitoring

Life extension of mooring systems

Removal of impact damage using cutting tools to recover failed Flexible Riser/J-tube

Stability monitoring systems

3D modelling and photogrammetry

Dredging, coating removal and cutting of damaged pipeline

Hammered pile alignment and monitoring

Coating removal on Caspian Sea platform

Diamond wire saw cutting to assist decommissioning operations

Multi-asset mooring inspection

Hydraulic shears and diamond wire saw, MacCulloch field decommissioning

Mesh data networks for multi-vessel operation