ACE Fixed Overboarding Framework

ACE Fixed Overboarding Framework

ACE Fixed Overboarding Framework

The ACE Overboarding Framework is designed for use in lifting operations to alter the direction of the wire rope during overboarding operations.

Suitable for use in zoned and safe areas 

Fully fabricated steel framework 

Deployment of subsea baskets and tooling 

Abandonment and recovery operations 

6 Tonne Over-boarding Framework with 1m outboard reach (can be fitted with a winch)

20 Tonne Over-boarding Framework with 1.5m outboard reach (can be fitted with 2 winches)

150 Tonne Over-boarding Framework with 4m outboard reach